Commander III Barrier/Parapet Applications

Junctions 3 to 4 of the M2 expressway in Belfast, Northern Ireland, involved the engineering of a new concrete barrier system capable of accommodating up to 3.9 ft. (1.2 m) of roadway level differences.

The wide step barrier required 0.9 cubic yards (0.7 m3) of concrete to slipform just 3.3 ft. (1 m), and it was slipformed by a three-track Commander III.

Read more about this project in GOMACO World 37.2.

This contractor in St. Louis, Missouri, is slipforming variable barrier wall up to 7 ft. (2.1 m) tall.

A GOMACO 9500 feeds concrete onto the belt of a four-track Commander III slipforming barrier wall on a project in St. Louis. The Commander III is equipped with a variable-height mold for slipforming both the variable and non-variable center median barrier.

Read more about this project in GOMACO World 37.1.

This Commander III slipformed parapet on the Bill Emerson Memorial Bridge connecting Cape Girardeau, Missouri, to East Cape Girardeau, Illinois.

Read more about this project in GOMACO World 32.2.

Steel reinforcing is fed into the front of the mold as this 5 ft. 7 in. (1.7 m) tall European-style step barrier is slipformed with a four-track Commander III on a project in London, England.

Rebars are hydraulically inserted into the 24 inch (610 mm) wide top of this barrier wall being slipformed by a four-track Commander III on a project in St. Louis, Missouri.

Read more about this project in GOMACO World 37.1.

The mold on this Commander III can be hydraulically telescoped up to 11.8 in. (300 mm) for easy positioning and setup.

Read more about this project in GOMACO World 36.3.

This Commander III is equipped with the four-track barrier package and has a hydraulically extendible rear frame to extend the right rear leg. The wall on this project has a 19 inch (483 mm) wide top, is 39.25 inches (997 mm) wide at the base and its sidewalls vary in height from 3.5 to 6.5 feet (1.1 to 2 m).

Read more about this project in GOMACO World 37.1.

A contractor in England slipforms right-side step barrier. The G21/G22 control system allows for multiple applications and configurations, which gives the Commander III its exceptional versatility. A total station tracks the progress of a Commander III on a barrier wall project in Belgium. The project was slipformed with the Leica 3-D stringless guidance system. Barrier wall is being slipformed on the M7 Motorway near Sydney, New South Wales, Australia, by this four-track Commander III.

This Commander III is slipforming 35.4 in. (900 mm) tall European step barrier on the N11 Highway project, just outside of Kilpedder, Ireland.

This Commander III three-track slipforms variable barrier with the side-mounted mold. This four-track Commander III is slipforming barrier wall on a project in Korea.
A Commander III slipformed this variable wall over steel reinforcement in Arkansas.

Read more about this project in GOMACO World 32.2.

The tracks on this Commander III are spun around so the machine thinks it's moving forward, when it's actually running in reverse on this unique bridge parapet project.

Read more about this project in GOMACO World 34.1.

A four-track Commander III slipformed variable barrier as tall as six feet (1.8 m) high on this project in Ontario, Canada.

Read more about this project in GOMACO World 33.1.

This four-track Commander III is equipped with a side-mounted barrier package. All-Track Positioning (ATP) allows the four legs to be put in various positions to permit the sidemounting of the variable barrier mold. A Commander III slipformed parapet on this bridge on the Minneapolis-St. Paul International Airport. The parapet was slipformed 34 inches (864 mm) tall and the back wall had a seven inch (178 mm) overhang.

Read more about this project in GOMACO World 29.2.

This variable barrier ranged in height from 42 inches (1067 mm) all the way up to 84 inches (2134 mm) on this project in Grand Rapids, Michigan.

Read more about this project in GOMACO World 29.1.

Dumping two ready-mix trucks at a time provided a consistent flow of concrete to the Commander III on this barrier wall in Ontario, Canada.

Read more about this project in GOMACO World 29.1.

More than 41,000 feet (12.497 m) of variable barrier was slipformed by this Commander III through the mountains near Asheville, North Carolina.

Read more about this project in GOMACO World 31.1.

Commander III More Commander III Photos:
Curb & Gutter
Slipform Paving
Sidewalks & Recreational Trails
Unique Applications
Commander III Specifications
Download The Commander III
Brochure (PDF Format)

A BIG Project On A Small Island - Goodfellow Bros., Inc.

Runway Work On Botswana's International Airport - WBHO

Slipforming Curb And Gutter For The Athletes Of The World - Niko Projects Inc.

Slipforming Eases A Complicated Project - Extrudakerb

Around The World 37.2 - Patstroy Ead Lovetch & Aktel

Polymer Paving On A Project In Sacramento - C.C. Myers Inc.

Double Variable Barrier Wall On Illinois' I-55 - P.T. Ferro Construction Company

A High-Speed Connection Between France And Spain - EIFFAGE Travaux Publics, France

Commander III Power On A Mono Project In Arizona - Petra Contracting

Around The World 37.1 - WBHO

GOMACO Versatility Showcased On I-64 Project - Fred Weber, Inc., & Millstone Bangert, Inc.

Paving 1,000,000 Meters (3,280,840 ft) With Commander IIIs In The UK - Peter Davidson

Superb Production On Indiana's SUPER 70 Project - E&B Paving

The Ayabe-Yokotani Tunnel Project - Kajima Road Company Ltd. & K-Con

Around The World 36.3 - TSBV

The Commander III - The Chicago-Land Workhorse - Lorig Construction

Another High-Production Day For Shirley Concrete... - Shirley Concrete Company

Around The World 36.1 - K-Con, Kajima Road Company Ltd., ABI Group Ltd., & S.M. Morris Ltd.

Commander III Versatility Rocks! - DMC Concrete Developments

Paving Roadway Through Two Tunnel Projects In Japan - Taisei-Rotec & K-Con Company Ltd.

34 Paving Passes For A GHP-2800 At The Charles de Gaulle International Airport - Betonac nv

Commander III: The Contractor's Choice

Around The World 35.2 - Abi Group Limited, Kodama, South East Concreting Pty. Ltd. & Imperial Paving Limited

The Power Of Choice... - WMC Contracting Company

Mountain Conditions Can't Slow Down A Commander III - Winvan Paving Ltd.

Trimming And Pouring Eight Feet (2.4 m) Wide With A Commander III - Tschiggfrie Excavating

Paving The Dan Ryan Expressway - Walsh Construction Company

Moving Forward While Slipforming In Reverse - General Concrete Construction Inc.

Breaking Their Own Record... Again & Again - Q&D Construction

Around The World 34.1 - Machang Construction Equipment, Liam Maher & Kosmos

Slipping A Slope On The Inside Of A Breakwater In Japan - Maeda Road Construction Company

Two Project Managers... Two GOMACO Paving Trains... Only One Concrete Paving Award - E&B Paving, Inc.

At Work 24/7 On The Channel Tunnel Rail Link Project - Peter Davidson

Paving Ontario's Busiest Highway - Coco Paving

Around The World 33.1 - P.T. Wijaya Karay

Slipforming Wall 60 Feet (18.3 m) Above The Mississippi River - Gerdan Slipforming

Commander III Powers Through A Tall Wall Section Of I-30 - Weaver Bailey Contractors Inc.

Quality & Patience Rules Parapet Projects - Dormark Construction

The World's Quietest Paver Slipforms A New Quiet Roadway - Betonac nv

Around The World 31.2 - Aecon

Variable Barrier In Changing Mountain Conditions - Summers-Taylor Inc.

Solution Creates Better Than Expected Results - Primco, Inc.

Taking Side-Mounted Paving To The Limit - McMahon Contracting L.P.

The New Generation Yields Advantages - Online Curbing and Concrete Ltd.

A Two-Day Instant Subdivision - Franklin's Earthmoving

Around The World 30.3 - Municipal Contracting

Leaving A Lasting Impression - Allen & Sons Construction Inc.

The New Generation - Creating Opportunities In Pennsylvania - Charles J. Merlo, Inc.

Massive Road And Airport Projects Push New And Old Technology To The Limit - Ajax Paving Industries

Tight Conditions Rebuilding Two Of Pennsylvania's Highways - Hi-Way Paving, Inc.

Building A Fleet Of New Generation Commander IIIs - Finishing Edge LLC

The Barrier Specialists - Tavares Concrete Company Inc.

First Time Commander III Owners - Tackle Tight Clearances - Chaney Cement Contractors

Fast, Smooth And Award Winning - Pavers, Inc.

Steep Grades Can't Slow Down A Commander - Rossi Concrete, Inc.

Bridge Work - Progressive Contractors Inc.

On A Handshake - William Beaudoin & Sons

Love At First Sight - Allen & Sons Construction, Inc.

Sideshifting: Saving Time and Money - Ocean Contractors Limited

One Machine - S & N Contractors, Inc.

Large Or Small, The New Generation Handles Them All - Burcon Slipform Inc.

Makin' Money With Mono - Strange & Chalmers, Inc.

Running Wide Open - Advance Concrete Limited

Blazing A Trail - Rampart Corporation

Two Ready-Mix Trucks At A Time! No Problem! - Miwel Construction Limited

Waiting For A New Generation - Fred Weber Inc.

First Yards - Harper Construction

Top Of The Line - H.W. Johnson Concrete, Inc.

New Generation Commander III Wins Award

Impossible Scenarios For The New Generation Commander III - N. Piccoli Construction Limited

New Generation Commander III Four-Track - Primco, Inc.

"Dream Come True" - New Commander III - Shirley Concrete Company


GOMACO Home / Curb & Gutter / Pavers / Placer/Spreaders / Trimmer/Placers / Texture/Cure Machines / Cylinder Finishers / Canal/Slope / Support Equipment / Contact Us! / Sitemap / GOMACO University / Gomaco Trolley Company / Godbersen Equipment Company

Copyright © 1998-2010 GOMACO Corporation Inc.
All Rights Reserved

web@gomaco.com or visit our feedback page