Slotted Drain & V-Channel In Ireland: The first slipforming steps on this project involved the drainage system. The contractor slipformed either a v-channel (left) or a 11.8 in. (300 mm) diameter slot drain (right) with their Commander III. Approximately 14,764 ft. (4500 m) of concrete drainage system was slipformed.

Read more about this project in GOMACO World 37.2.

Rice Fields Irrigation In Turkey: This contractor slipforms a new water canal, with their four-track Commander III, to irrigate rice fields in Kesan, Turkey.
Water Canal In Bulgaria: A three-track Commander III is slipforming water canal in the countryside near Lovetch, Bulgaria. Pipe Insertion Into Feed Bunks In Australia: The feed bunk mold has a hydraulic pipe inserter mechanism that allows the insertion of 4 ft. 3 in. (1.3 m) long pipes into the sidewall of the new feed bunk on-the-go while slipforming.

Read more about this project in GOMACO World 35.2.

Paving On Curved Tunnel Walls In The UK: The tracks on this Commander III, equipped with the Leica stringless system, were built to tilt up to a 35 degree angle (seen in bottom photo) to run on the curved walls of the Channel Tunnel Rail Link project connecting London, England, to Europe.

The Commander III was used to slipform the floor and two evacuation walkways in the tunnel.

Read more about this project in GOMACO World 33.1.

Five Different Profiles In France/Spain Tunnel: “Le Perthus” tunnel is the link between Perpignan in France and Figueras in Spain in the French/Spanish border town of Perthus. Two 28.5 ft. (8.7 m) diameter tunnels, each 5.2 miles (8.4 km) long, is part of the overall link connecting the two countries.

The floor had an average thickness of 23.6 in. (600 mm) and was 18.4 ft. (5.6 m) wide. Cross slope of the floor varied between zero and 7.67 percent. Three different drainage pipes were incorporated into the floor during slipforming. The Commander III four-track had its tracks turned at 35 degree angles to run along the slope of the tunnel walls. The inner leg tubes were turned 45 degrees from their normal position.

Read more about this project in GOMACO World 37.1.

1:2.4 Slope Project In Japan: This contractor in Japan has completed a slope project with their four-track Commander III. The project required them to slipform a 9.8 ft. (3 m) wide slab at a 1:2.4 slope. The project was part of building a slope on the inside of a breakwater.

Read more about this project in GOMACO World 34.1.

High-Drive Tracks For Tight-Clearance Paving In The United States: GOMACO’s optional high-drive tracks are ideal for minimum-clearance situations that sometimes exist when adding lanes to ramps and highways or replacing streets in residential areas. The 11 in. (279 mm) wide track has a clearance height of 21.85 in. (555 mm) to the bottom of the track motor. The height of the motor allows clearance on the slab side of the track.
Imprinted Barrier In The United States: A unique, four-track, under-mounted barrier package is available for most types of barrier applications. The Commander III four-track with the under-mounted barrier is imprinting a stone pattern on the extruded wall. V-Ditch In Australia: This contractor is slipforming V-ditch for drainage with a Commander III in Australia. Imprinted Flat Surface: A roller mounted to the back of the four-track Commander III imprints a cobblestone pattern on the flat surface of the concrete on this project in Florida.
Slotted Drain Near London: Slotted drain is slipformed by a three-track Commander III along the M25 Ring Road near London, England. Longitudinal Groove In Cattle Barn Floor In The United States: The Commander III paves the floor for a new cattle barn while applying a longitudinal groove. It was also slipformed with integral curb on both sides. Inverted Stairway In Canada: A Commander III with a rear-mounted auger finishes an inverted stairway test pour in Toulnoustouc, Quebec, Canada. The concrete sections will form the sides of a dam.
Commander III More Commander III Photos:
Barrier
Curb & Gutter
Slipform Paving
Sidewalks & Recreational Trails
Commander III Specifications
Download The Commander III
Brochure (PDF Format)

A BIG Project On A Small Island - Goodfellow Bros., Inc.

Runway Work On Botswana's International Airport - WBHO

Slipforming Curb And Gutter For The Athletes Of The World - Niko Projects Inc.

Slipforming Eases A Complicated Project - Extrudakerb

Around The World 37.2 - Patstroy Ead Lovetch & Aktel

Polymer Paving On A Project In Sacramento - C.C. Myers Inc.

Double Variable Barrier Wall On Illinois' I-55 - P.T. Ferro Construction Company

A High-Speed Connection Between France And Spain - EIFFAGE Travaux Publics, France

Commander III Power On A Mono Project In Arizona - Petra Contracting

Around The World 37.1 - WBHO

GOMACO Versatility Showcased On I-64 Project - Fred Weber, Inc., & Millstone Bangert, Inc.

Paving 1,000,000 Meters (3,280,840 ft) With Commander IIIs In The UK - Peter Davidson

Superb Production On Indiana's SUPER 70 Project - E&B Paving

The Ayabe-Yokotani Tunnel Project - Kajima Road Company Ltd. & K-Con

Around The World 36.3 - TSBV

The Commander III - The Chicago-Land Workhorse - Lorig Construction

Another High-Production Day For Shirley Concrete... - Shirley Concrete Company

Around The World 36.1 - K-Con, Kajima Road Company Ltd., ABI Group Ltd., & S.M. Morris Ltd.

Commander III Versatility Rocks! - DMC Concrete Developments

Paving Roadway Through Two Tunnel Projects In Japan - Taisei-Rotec & K-Con Company Ltd.

34 Paving Passes For A GHP-2800 At The Charles de Gaulle International Airport - Betonac nv

Commander III: The Contractor's Choice

Around The World 35.2 - Abi Group Limited, Kodama, South East Concreting Pty. Ltd. & Imperial Paving Limited

The Power Of Choice... - WMC Contracting Company

Mountain Conditions Can't Slow Down A Commander III - Winvan Paving Ltd.

Trimming And Pouring Eight Feet (2.4 m) Wide With A Commander III - Tschiggfrie Excavating

Paving The Dan Ryan Expressway - Walsh Construction Company

Moving Forward While Slipforming In Reverse - General Concrete Construction Inc.

Breaking Their Own Record... Again & Again - Q&D Construction

Around The World 34.1 - Machang Construction Equipment, Liam Maher & Kosmos

Slipping A Slope On The Inside Of A Breakwater In Japan - Maeda Road Construction Company

Two Project Managers... Two GOMACO Paving Trains... Only One Concrete Paving Award - E&B Paving, Inc.

At Work 24/7 On The Channel Tunnel Rail Link Project - Peter Davidson

Paving Ontario's Busiest Highway - Coco Paving

Around The World 33.1 - P.T. Wijaya Karay

Slipforming Wall 60 Feet (18.3 m) Above The Mississippi River - Gerdan Slipforming

Commander III Powers Through A Tall Wall Section Of I-30 - Weaver Bailey Contractors Inc.

Quality & Patience Rules Parapet Projects - Dormark Construction

The World's Quietest Paver Slipforms A New Quiet Roadway - Betonac nv

Around The World 31.2 - Aecon

Variable Barrier In Changing Mountain Conditions - Summers-Taylor Inc.

Solution Creates Better Than Expected Results - Primco, Inc.

Taking Side-Mounted Paving To The Limit - McMahon Contracting L.P.

The New Generation Yields Advantages - Online Curbing and Concrete Ltd.

A Two-Day Instant Subdivision - Franklin's Earthmoving

Around The World 30.3 - Municipal Contracting

Leaving A Lasting Impression - Allen & Sons Construction Inc.

The New Generation - Creating Opportunities In Pennsylvania - Charles J. Merlo, Inc.

Massive Road And Airport Projects Push New And Old Technology To The Limit - Ajax Paving Industries

Tight Conditions Rebuilding Two Of Pennsylvania's Highways - Hi-Way Paving, Inc.

Building A Fleet Of New Generation Commander IIIs - Finishing Edge LLC

The Barrier Specialists - Tavares Concrete Company Inc.

First Time Commander III Owners - Tackle Tight Clearances - Chaney Cement Contractors

Fast, Smooth And Award Winning - Pavers, Inc.

Steep Grades Can't Slow Down A Commander - Rossi Concrete, Inc.

Bridge Work - Progressive Contractors Inc.

On A Handshake - William Beaudoin & Sons

Love At First Sight - Allen & Sons Construction, Inc.

Sideshifting: Saving Time and Money - Ocean Contractors Limited

One Machine - S & N Contractors, Inc.

Large Or Small, The New Generation Handles Them All - Burcon Slipform Inc.

Makin' Money With Mono - Strange & Chalmers, Inc.

Running Wide Open - Advance Concrete Limited

Blazing A Trail - Rampart Corporation

Two Ready-Mix Trucks At A Time! No Problem! - Miwel Construction Limited

Waiting For A New Generation - Fred Weber Inc.

First Yards - Harper Construction

Top Of The Line - H.W. Johnson Concrete, Inc.

New Generation Commander III Wins Award

Impossible Scenarios For The New Generation Commander III - N. Piccoli Construction Limited

New Generation Commander III Four-Track - Primco, Inc.

"Dream Come True" - New Commander III - Shirley Concrete Company


GOMACO Home / Curb & Gutter / Pavers / Placer/Spreaders / Trimmer/Placers / Texture/Cure Machines / Cylinder Finishers / Canal/Slope / Support Equipment / Contact Us! / Sitemap / GOMACO University / Gomaco Trolley Company / Godbersen Equipment Company

Copyright © 1998-2010 GOMACO Corporation Inc.
All Rights Reserved

web@gomaco.com or visit our feedback page