Top Navigation

Three-Track Commander III Barrier/Parapet Applications

Junctions 3 to 4 of the M2 expressway in Belfast, Northern Ireland, involved the engineering of a new concrete barrier system capable of accommodating up to 3.9 ft. (1.2 m) of roadway level differences.

The wide step barrier required 0.9 cubic yards (0.7 m3) of concrete to slipform just 3.3 ft. (1 m), and it was slipformed by a three-track Commander III.

Read more about this project in GOMACO World 37.2.

This Commander III slipformed parapet on the Bill Emerson Memorial Bridge connecting Cape Girardeau, Missouri, to East Cape Girardeau, Illinois.

Read more about this project in GOMACO World 32.2.

This Commander III is slipforming 35.4 in. (900 mm) tall European step barrier on the N11 Highway project, just outside of Kilpedder, Ireland.

This Commander III three-track slipforms variable barrier with the side-mounted mold. More than 41,000 feet (12.497 m) of variable barrier was slipformed by this Commander III through the mountains near Asheville, North Carolina.

Read more about this project in GOMACO World 31.1.

This variable barrier was slipformed over steel reinforcing at heights that ranged from 51 to 57 inches (1295 to 1448 mm), and widths that ranged from 29 to 30.25 inches (737 to 768 mm). This three-track Commander III is slipforming variable barrier, while moving in reverse, on a project in Ventura, California.
Three-Track Commander III More Three-Track Commander III Photos:
Curb & Gutter
Sidewalks & Recreational Trails
Unique Applications
Commander III Specifications
Download The Commander III
Brochure (PDF Format)
Commander III Information In:
Deutsch - Español - Francais - Italiano
Download The GOMACO Full Line
Brochure (PDF Format)

Slipforming Curb And Gutter For The Athletes Of The World - Niko Projects Inc.

Slipforming Eases A Complicated Project - Extrudakerb

Around The World 37.2 - Patstroy Ead Lovetch & Aktel

A High-Speed Connection Between France And Spain - EIFFAGE Travaux Publics, France

Commander III Power On A Mono Project In Arizona - Petra Contracting

Another High-Production Day For Shirley Concrete... - Shirley Concrete Company

Around The World 36.1 - K-Con, Kajima Road Company Ltd., ABI Group Ltd., & S.M. Morris Ltd.

Commander III Versatility Rocks! - DMC Concrete Developments

Commander III: The Contractor's Choice

Around The World 35.2 - Abi Group Limited, Kodama, South East Concreting Pty. Ltd. & Imperial Paving Limited

The Power Of Choice... - WMC Contracting Company

Mountain Conditions Can't Slow Down A Commander III - Winvan Paving Ltd.

Trimming And Pouring Eight Feet (2.4 m) Wide With A Commander III - Tschiggfrie Excavating

Moving Forward While Slipforming In Reverse - General Concrete Construction Inc.

Breaking Their Own Record... Again & Again - Q&D Construction

Around The World 34.1 - Machang Construction Equipment, Liam Maher & Kosmos

Slipforming Wall 60 Feet (18.3 m) Above The Mississippi River - Gerdan Slipforming

Quality & Patience Rules Parapet Projects - Dormark Construction

Around The World 31.2 - Aecon

Variable Barrier In Changing Mountain Conditions - Summers-Taylor Inc.

The New Generation Yields Advantages - Online Curbing and Concrete Ltd.

A Two-Day Instant Subdivision - Franklin's Earthmoving

Around The World 30.3 - Municipal Contracting

Leaving A Lasting Impression - Allen & Sons Construction Inc.

Building A Fleet Of New Generation Commander IIIs - Finishing Edge LLC

Fast, Smooth And Award Winning - Pavers, Inc.

Steep Grades Can't Slow Down A Commander - Rossi Concrete, Inc.

On A Handshake - William Beaudoin & Sons

Love At First Sight - Allen & Sons Construction, Inc.

Sideshifting: Saving Time and Money - Ocean Contractors Limited

Large Or Small, The New Generation Handles Them All - Burcon Slipform Inc.

Makin' Money With Mono - Strange & Chalmers, Inc.

Running Wide Open - Advance Concrete Limited

Blazing A Trail - Rampart Corporation

Two Ready-Mix Trucks At A Time! No Problem! - Miwel Construction Limited

First Yards - Harper Construction

Top Of The Line - H.W. Johnson Concrete, Inc.

New Generation Commander III Wins Award

Impossible Scenarios For The New Generation Commander III - N. Piccoli Construction Limited

"Dream Come True" - New Commander III - Shirley Concrete Company


GOMACO Home / Curb & Gutter / Pavers / Placer/Spreaders / Trimmer/Placers / Texture/Cure Machines / Cylinder Finishers / Canal/Slope / Support Equipment / Contact Us! / Sitemap / GOMACO University / Gomaco Trolley Company / Godbersen Equipment Company

Copyright © 1998-2010 GOMACO Corporation Inc.
All Rights Reserved

web@gomaco.com or visit our feedback page