| Two layers of concrete are visible during the demonstration of the two-lift slipforming process. One layer is fed through the hopper, and the other is placed in front of the machine. This test was conducted on the GHP-2800 four-track slipform paver. |
The bottom layer of concrete for two-lift paving passes through the two-lift paving mold. |
The red dye in the top mixture illustrates the separation of the two concrete layers from the two-lift process. |