 |
|
SL-450 Applications
|
|
|
|
| The GOMACO RC Conveyor and the SL-450 are placing and finishing a concrete lining over a plastic membrane to seal this canal in China. |
This SL-450 with trimmer attachment was used to trim approximately 2.5 to three inches (64 to 76 mm) of sandy soil in Rio Rancho, New Mexico. |
 |
|
|
|
|
| This SL-450 is finishing the bank of a concrete water treatment pond in Overland Park, Kansas. |
 |
|
|
|
 |
 |
| The new race track at the Bristol Motor Speedway in Bristol, Tennessee, was poured in just 13 weeks with an SL-450.
Read more about this project in GOMACO World Vol. 36.1.
|
|
|
 |
|
|
|
|
| The GOMACO SL-450 finishes a trapezoidal channel in Ghana, with a bottom width of 43 ft. (13 m), top width of 75 ft. (23 m), a depth of 16 ft. (5 m), and a 1:1 slope. Thickness is 12 in. (300 mm) and weepholes were installed for the storm water drain. |
This SL-450 finishes a drainage canal at Washington Dulles Airport in Washington, D.C. |
 |
|
|
|
|
| Longitudinal and transverse joints are scored with attachments on the SL-450, and laborers on the Spanit® work bridge finish the joints. |
The SL-450 assured uniform concrete placement and slope thickness and finishes the slopes at a much faster rate than placing preformed concrete panels.
Read more about this project in GOMACO World 32.1.
|
 |
|
 |
|
|
 |
|
 |
|
|
 |
|
|
|
|