The 700 series of machines were used on the Narmada Canal project to finish the greater width bottom sections in multiple passes. RC Conveyors place the concrete in front of the machine. Deeper boomed conveyors and the larger 6000 Walkway Spanit® Work Bridges are incorporated to accommodate the greater slope lengths and match the ability of the 700 series machines.